How to Verify Free-Flange Ejector Pin Position During Maintenance
Key Takeaway: Add free-flange position verification to your standard mold maintenance checklist. Check: (1) flange axial position ±0.05mm, (2) clamping torque, (3) shaft surface condition at the set screw contact point.
Maintenance Checklist
- Position check: Measure pin protrusion from the mold face at ejector home position. Compare to the documented specification (±0.05mm).
- Clamp torque: Re-torque set screws to 1.5–2.0 Nm. For collet types, verify the clamp nut is finger-tight + 1/4 turn.
- Shaft inspection: Look for galling, scoring, or excessive set screw indentation on the shaft surface.
- Flange body: Check for cracks in the collet bore or stripped set screw threads. Replace the flange body if damaged.